22nd August 2026
00:05 – York → Doncaster Carr IEP Depot Arrived -7 Early operated by TransPennine Express
Empty coaching stock not available to passengers
Reported as far as Doncaster Carr IEP Depot · 1 of 1 stop made · 34 of 34 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| YRK York not advertised 3 min engineering allowance NNLLine | 10 | 0005 | 0006 | +1 | NNL | |
| Colton Junction pass | 0012½0012½ | pass0012 | ·on time | |||
| Hambleton North Junction pass | 0016½0016½ | pass0016 | ·on time | |||
| Temple Hirst Junction pass | 0019½0019½ | pass0019 | ·on time | |||
| Shaftholme Junction pass 1 min engineering, 2 min pathing allowance | 00240024 | pass0023 | -1 | |||
| DON Doncaster not advertised | 3 | 0030½0032 | 00280028 | -2 | ||
| Sand Bank Junction pass | 00340034 | passno report | ||||
| Doncaster Carr IEP Depot not advertised | 0037 | 0030 | -7 | |||
Italic estimated timing, bold is actual.