20th September 2026
18:47 – Cardiff Central → Barry Tourist Railway Never activated -10 Early operated by Transport for Wales
Empty coaching stock not available to passengers
Reported as far as Cadoxton · 1 of 1 stop made · 6 of 9 miles
Formation Class 150
Cardiff Central → Barry Down Siding
1 of 2
Barry Down Siding → Barry Tourist Railway
2 of 2
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| CDF Cardiff Central not advertised reverses here | 4 | 1847 | 1835 | -12 | ||
| Penarth Curve South Junction pass 2 min pathing allowance | 18501850 | passno report | ||||
| Cogan Junction pass | 18551855 | pass1840 | -15 | |||
| CAD Cadoxton pass | 2 | 19011901 | pass1851 | -10 | ||
| Barry Down Siding not advertised operational stop, reverses here UnLine | 19081913 | 18571858 | Un | |||
| Barry Tourist Railway not advertised | 1928 | 1913 | ||||
Italic estimated timing, bold is actual.