18th September 2026
21:05 – Margam Tc GBRF → Bristol East Depot Cancelled — Train cancelled at FOC request or planned not to run operated by Not specified (freight or charter)
Not yet reported
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Margam Tc GBRF not advertised | 2105 | |||||
| Margam Moors Junction pass | 21102110 | |||||
| Stormy pass | 21172117 | |||||
| BGN Bridgend pass | 2 | 21212121 | ||||
| PCD Pencoed pass | 21262126 | |||||
| PYC Pontyclun pass 1 min engineering allowance | 21302130 | |||||
| Leckwith North Junction pass 1 min pathing allowance BLine | 2140½2140½ | B | ||||
| CDF Cardiff Central not advertised operational stop, waits for another train to pass, crew changed | 2 | 2145½2149½ | ||||
| Long Dyke Junction pass MLLine | 2151½2151½ | ML | ||||
| Marshfield pass | 2157½2157½ | |||||
| Ebbw Junction pass | 22012201 | |||||
| NWP Newport (South Wales) pass | 3 | 2203½2203½ | ||||
| Maindee West Junction pass | 2204½2204½ | |||||
| Llanwern West Junction pass | 2208½2208½ | |||||
| STJ Severn Tunnel Junction pass | 4 | 2215½2215½ | ||||
| Severn Tunnel West pass | 2216½2216½ | |||||
| Severn Tunnel East pass | 2221½2221½ | |||||
| PIL Pilning pass 1 min engineering, 1 min pathing allowance | 1 | 2223½2223½ | ||||
| PWY Patchway pass | 1 | 2228½2228½ | ||||
| FIT Filton Abbey Wood pass MLLine | 1 | 2230½2230½ | ML | |||
| Horfield Junction pass | 2231½2231½ | |||||
| Dr Day's Junction pass ½ min pathing allowance DBLLine | 2235½2235½ | DBL | ||||
| North Somerset Junction pass | 22382238 | |||||
| Bristol East Depot not advertised | 2242 | |||||
Italic estimated timing, bold is actual.