4B56 0358 Cardiff Docks Rp GBRF to Gloucester N.Y. GBRF

TrainTimesLive
Menu Close menu

26th September 2026

03:58 – Cardiff Docks Rp GBRF → Gloucester N.Y. GBRF Cancelled — Train cancelled at FOC request or planned not to run operated by Not specified (freight or charter)

Not yet reported

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Cardiff Docks Rp GBRF not advertised 0358
Cardiff Tidal Tc GBRF not advertised operational stop 04280430
Pengam Reception Sdgs GBRF not advertised operational stop RLLine 04450447 RL
Rumney River Bridge Junction pass RLLine 04490449 RL
Marshfield pass 0454½0454½
Ebbw Junction pass 0458½0458½
Gaer Junction pass URLine 05000500 UR
NWP Newport (South Wales) pass RLLine URL 0502½0502½ RL
Maindee West Junction pass 05040504
Maindee East Junction pass 2½ min pathing allowance RLLine 0504½0504½ RL
Llanwern West Junction pass 0509½0509½
STJ Severn Tunnel Junction pass 4 0520½0520½
Severn Tunnel West pass 0521½0521½
Severn Tunnel East pass 05260526
PIL Pilning not advertised waits for another train to pass 1 min engineering allowance 1 0529½0538
PWY Patchway pass ½ min pathing allowance 1 05450545
BPW Bristol Parkway pass 2½ min pathing allowance 3 05470547
Westerleigh Junction pass 05540554
YAE Yate pass 05570557
Charfield pass 06030603
Standish Junction pass 1 min engineering allowance 06140614
Gloucester Yard Junction pass 06200620
Gloucester N.Y. GBRF not advertised 0623

Italic estimated timing, bold is actual.