6C19 1626 Swindon Transfer to St Philips Mrsh H S T D

TrainTimesLive
Menu Close menu

22nd August 2026

16:26 – Swindon Transfer → St Philips Mrsh H S T D Cancelled — Delays not investigated by Network Rail operated by Not specified (freight or charter)

Not yet reported

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
XSJ Swindon Transfer not advertised 1 min engineering allowance 1626
SWI Swindon pass 4 16301630
Wootton Bassett Junction pass 1636½1636½
CPM Chippenham pass 1 1647½1647½
Thingley East Junction pass 1648½1648½
Thingley Junction pass 1 min engineering allowance 1649½1649½
Bathampton Junction pass 16591659
BTH Bath Spa pass 1 min engineering, 3 min pathing allowance 1 1701½1701½
North Somerset Junction pass ½ min pathing allowance DMLine 1716½1716½ DM
Bristol East Junction pass UMLine 17181718 UM
BRI Bristol Temple Meads not advertised DT 1719½1739½
Bristol East Junction pass DMLine 1740½1740½ DM
North Somerset Junction pass 1742½1742½
XPM St Philips Mrsh H S T D not advertised 1753

Italic estimated timing, bold is actual.