3J30 0044 Peterborough North Yd GBRF to Harringay Up Rev Sdgs

TrainTimesLive
Menu Close menu

25th September 2026

00:44 – Peterborough North Yd GBRF → Harringay Up Rev Sdgs Planned operated by Not specified (freight or charter)

No movement reports · booked away 0044 · either it has not started, or its reports are not reaching us

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Peterborough North Yd GBRF not advertised ½ min pathing allowance 0044
XPQ P'boro Eastfield Junction pass SUDLine 0047½0047½ SUD
Spital South Junction P458 pass 0048½0048½
PBO Peterborough pass FLLine 1 00500050 FL
Fletton Junction pass 00520052
Conington South Junction pass 01000100
HUN Huntingdon pass SLLineFLPath 2 0109½0109½ SL FL
SDY Sandy pass SLLine 1 0124½0124½ SL
BIW Biggleswade pass 3 min engineering allowance 1 0129½0129½
HIT Hitchin pass SLLine 1 0142½0142½ SL
SVG Stevenage pass SLLineSLPath 1 0147½0147½ SL SL
Langley Junction pass ULLine 0148½0148½ UL
Langley Sth Junction pass 0149½0149½
Bragbury Junction pass 0151½0151½
Molewood Junction pass 1 min engineering, ½ min pathing allowance 0157½0157½
HFN Hertford North pass ½ min pathing allowance 1 02010201
Ponsbourne Tunnel SIG K894 pass 0205½0205½
GDH Gordon Hill pass 2 0212½0212½
BOP Bowes Park pass 1 0217½0217½
AAP Alexandra Palace pass 1 min engineering allowance SL2Line 2 02200220 SL2
XHU Harringay Up Rev Sdgs not advertised 0227

Italic estimated timing, bold is actual.