28th August 2026
20:20 – Ferrybridge Ps Gypsum GBRF → Doncaster Down Decoy GBRF Cancelled — Train cancelled at FOC request or planned not to run operated by Not specified (freight or charter)
Not yet reported
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Ferrybridge Ps Gypsum GBRF not advertised | 2020 | |||||
| Ferrybridge North Junction pass 1 min engineering, 1 min pathing allowance | 20252025 | |||||
| Knottingley West Junction pass | 20292029 | |||||
| Knottingley South Junction pass | 20302030 | |||||
| Haywood Junction pass | 20402040 | |||||
| Shaftholme Junction not advertised waits for another train to pass 1 min engineering, 1 min pathing allowance | 2043½2105½ | |||||
| DON Doncaster pass | UF | 21132113 | ||||
| Bridge Junction pass DS1Line | 21142114 | DS1 | ||||
| Decoy Nth Junction pass 1½ min pathing allowance WSLLine | 2117½2117½ | WSL | ||||
| Doncaster Down Decoy GBRF not advertised | 2122 | |||||
Italic estimated timing, bold is actual.