6D10 2020 Ferrybridge Ps Gypsum GBRF to Doncaster Down Decoy GBRF

TrainTimesLive
Menu Close menu

28th August 2026

20:20 – Ferrybridge Ps Gypsum GBRF → Doncaster Down Decoy GBRF Cancelled — Train cancelled at FOC request or planned not to run operated by Not specified (freight or charter)

Not yet reported

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Ferrybridge Ps Gypsum GBRF not advertised 2020
Ferrybridge North Junction pass 1 min engineering, 1 min pathing allowance 20252025
Knottingley West Junction pass 20292029
Knottingley South Junction pass 20302030
Haywood Junction pass 20402040
Shaftholme Junction not advertised waits for another train to pass 1 min engineering, 1 min pathing allowance 2043½2105½
DON Doncaster pass UF 21132113
Bridge Junction pass DS1Line 21142114 DS1
Decoy Nth Junction pass 1½ min pathing allowance WSLLine 2117½2117½ WSL
Doncaster Down Decoy GBRF not advertised 2122

Italic estimated timing, bold is actual.