21st September 2026
20:20 – Ferrybridge Ps Gypsum GBRF → Doncaster Down Decoy GBRF Arrived -3 Early operated by Not specified (freight or charter)
Reported as far as Doncaster Down Decoy GBRF · 10 of 10 reporting points · 18 of 18 miles
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Ferrybridge Ps Gypsum GBRF not advertised | 2020 | no report | ||||
| Ferrybridge North Junction pass 1 min engineering, 1 min pathing allowance | 20252025 | pass2027 | +2 | |||
| Knottingley West Junction pass | 20292029 | pass2029 | ·on time | |||
| Knottingley South Junction pass | 20302030 | pass2031 | +1 | |||
| Haywood Junction pass | 20402040 | pass2043 | +3 | |||
| Shaftholme Junction not advertised waits for another train to pass 1 min engineering, 1 min pathing allowance | 2043½2105½ | 20422102 | -3 | |||
| DON Doncaster pass | UF | 21132113 | pass2109 | -4 | ||
| Bridge Junction pass DS1Line | 21142114 | pass2111 | -3 | DS1 | ||
| Decoy Nth Junction pass 1½ min pathing allowance WSLLine | 2117½2117½ | pass2115 | -2 | WSL | ||
| Doncaster Down Decoy GBRF not advertised | 2122 | 2119 | -3 | |||
Italic estimated timing, bold is actual.