6D10 2020 Ferrybridge Ps Gypsum GBRF to Doncaster Down Decoy GBRF

TrainTimesLive
Menu Close menu

21st September 2026

20:20 – Ferrybridge Ps Gypsum GBRF → Doncaster Down Decoy GBRF Arrived -3 Early operated by Not specified (freight or charter)

Reported as far as Doncaster Down Decoy GBRF · 10 of 10 reporting points · 18 of 18 miles

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Ferrybridge Ps Gypsum GBRF not advertised 2020 no report
Ferrybridge North Junction pass 1 min engineering, 1 min pathing allowance 20252025 pass2027 +2
Knottingley West Junction pass 20292029 pass2029 ·on time
Knottingley South Junction pass 20302030 pass2031 +1
Haywood Junction pass 20402040 pass2043 +3
Shaftholme Junction not advertised waits for another train to pass 1 min engineering, 1 min pathing allowance 2043½2105½ 20422102 -3
DON Doncaster pass UF 21132113 pass2109 -4
Bridge Junction pass DS1Line 21142114 pass2111 -3 DS1
Decoy Nth Junction pass 1½ min pathing allowance WSLLine 2117½2117½ pass2115 -2 WSL
Doncaster Down Decoy GBRF not advertised 2122 2119 -3

Italic estimated timing, bold is actual.