6D10 2020 Ferrybridge Ps Gypsum GBRF to Doncaster Down Decoy GBRF

TrainTimesLive
Menu Close menu

25th September 2026

6D10 · 20:20 – Ferrybridge Ps Gypsum GBRF → Doncaster Down Decoy GBRF Arrived -5 Early operated by Not specified (freight or charter)

WTTThe permanent working timetable Pathed as 600 tonnes on diesel at 60mph

Reported as far as Doncaster Down Decoy GBRF · 10 of 10 reporting points · 18 of 18 miles

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Ferrybridge Ps Gypsum GBRF not advertised 2020 1959 -21
Ferrybridge North Junction pass 1 min engineering, 1 min pathing allowance 20252025 pass2004 -21
Knottingley West Junction pass 20292029 pass2007 -22
Knottingley South Junction pass 20302030 pass2008 -22
Haywood Junction pass 20402040 pass2023 -17
Shaftholme Junction not advertised waits for another train to pass 1 min engineering, 1 min pathing allowance 2043½2105½ 20232043 -22
DON Doncaster pass UF 21132113 pass2107 -6
Bridge Junction pass DS1Line 21142114 passno report DS1
Decoy Nth Junction pass 1½ min pathing allowance WSLLine 2117½2117½ passno report WSL
Doncaster Down Decoy GBRF not advertised 2122 2117 -5