25th September 2026
6D10 · 20:20 – Ferrybridge Ps Gypsum GBRF → Doncaster Down Decoy GBRF Arrived -5 Early operated by Not specified (freight or charter)
WTTThe permanent working timetable Pathed as 600 tonnes on diesel at 60mph
Reported as far as Doncaster Down Decoy GBRF · 10 of 10 reporting points · 18 of 18 miles
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Ferrybridge Ps Gypsum GBRF not advertised | 2020 | 1959 | -21 | |||
| Ferrybridge North Junction pass 1 min engineering, 1 min pathing allowance | 20252025 | pass2004 | -21 | |||
| Knottingley West Junction pass | 20292029 | pass2007 | -22 | |||
| Knottingley South Junction pass | 20302030 | pass2008 | -22 | |||
| Haywood Junction pass | 20402040 | pass2023 | -17 | |||
| Shaftholme Junction not advertised waits for another train to pass 1 min engineering, 1 min pathing allowance | 2043½2105½ | 20232043 | -22 | |||
| DON Doncaster pass | UF | 21132113 | pass2107 | -6 | ||
| Bridge Junction pass DS1Line | 21142114 | passno report | DS1 | |||
| Decoy Nth Junction pass 1½ min pathing allowance WSLLine | 2117½2117½ | passno report | WSL | |||
| Doncaster Down Decoy GBRF not advertised | 2122 | 2117 | -5 | |||
Italic estimated timing, bold is actual.