29th August 2026
13:53 – Machen Quarry (Flhh) → Stoke Gifford (Fhh) Planned operated by Not specified (freight or charter)
No movement reports · booked away 1353 · either it has not started, or its reports are not reaching us
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Machen Quarry (Flhh) not advertised | 1353 | |||||
| Pj1995 Stop Board not advertised operational stop | 14101411 | |||||
| Pj1999 Signal not advertised single-line token exchanged | 14281430 | |||||
| Park Junction pass | 14331433 | |||||
| Gaer Junction pass UMLine | 14361436 | UM | ||||
| NWP Newport (South Wales) pass MLLine | 3 | 1438½1438½ | ML | |||
| Maindee West Junction pass | 14401440 | |||||
| Maindee East Junction pass 7 min pathing allowance RLLine | 14411441 | RL | ||||
| Llanwern West Junction pass | 1450½1450½ | |||||
| Llanwern Steelworks East pass 8 min pathing allowance | 14551455 | |||||
| STJ Severn Tunnel Junction pass | 4 | 1509½1509½ | ||||
| Severn Tunnel West pass | 1510½1510½ | |||||
| Severn Tunnel East pass | 1516½1516½ | |||||
| PIL Pilning pass 1 min engineering allowance | 1 | 1518½1518½ | ||||
| PWY Patchway pass 3 min pathing allowance | 1 | 1528½1528½ | ||||
| BPW Bristol Parkway pass ½ min pathing allowance | 3 | 1534½1534½ | ||||
| Westerleigh Junction pass | 15421542 | |||||
| Chipping Sodbury not advertised locomotive runs round, waits for another train to pass 1 min engineering, ½ min pathing allowance | 15501614 | |||||
| Westerleigh Junction pass | 1620½1620½ | |||||
| BPW Bristol Parkway pass operational stop | DGL | 16281628 | ||||
| Bristol Parkway SIG Bl1514 not advertised reverses here, propels from here | 16301632 | |||||
| Stoke Gifford (Fhh) not advertised | 1637 | |||||
Italic estimated timing, bold is actual.