4R49 0830 Drax Power Station to Immingham Biomass Lp (Dbc)

TrainTimesLive
Menu Close menu

26th September 2026

08:30 – Drax Power Station → Immingham Biomass Lp (Dbc) Planned operated by Not specified (freight or charter)

No movement reports · booked away 0830 · either it has not started, or its reports are not reaching us

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Drax Power Station not advertised ½ min pathing allowance 0830
Drax Branch Junction pass 0838½0838½
HEL Hensall pass 0840½0840½
WBD Whitley Bridge pass 08430843
Sudforth Lane Signal Box pass 08450845
Knottingley East Junction pass 08490849
Knottingley South Junction pass 0850½0850½
Haywood Junction pass 0901½0901½
Thorpe Marsh Junction pass 0904½0904½
HFS Hatfield & Stainforth pass 1 min pathing allowance SLLine 0911½0911½ SL
Thorne Junction pass 09160916
CWE Crowle pass 1 min engineering, 1½ min pathing allowance 1 09250925
SCU Scunthorpe pass 1 09370937
Scunthorpe F.O.B. Junction pass 1 min engineering allowance 09400940
Wrawby Junction pass FLLine 09500950 FL
BTB Barnetby pass 2 09510951
Brocklesby Junction pass 0956½0956½
ULC Ulceby pass 2 min engineering, 4½ min pathing allowance 0958½0958½
Humber Road Junction pass 1012½1012½
Immingham West Junction pass 10161016
Immingham Biomass Lp (Dbc) not advertised 1020

Italic estimated timing, bold is actual.