6H61 0555 Immingham Biomass Lp (Dbc) to Drax Power Station

TrainTimesLive
Menu Close menu

18th September 2026

05:55 – Immingham Biomass Lp (Dbc) → Drax Power Station Arrived -3 Early operated by Not specified (freight or charter)

Reported as far as Drax Power Station · 23 of 23 reporting points · 63 of 63 miles

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Immingham Biomass Lp (Dbc) not advertised 0555 0552 -3
Immingham West Junction pass 05590559 passno report
Humber Road Junction pass 1 min engineering allowance 06030603 pass0600 -3
ULC Ulceby pass 1 0611½0611½ pass0608 -3
Brocklesby Junction pass GLLine 0613½0613½ pass0611 -2 GL
BTB Barnetby pass SLLine 4 0623½0623½ pass0622 -1 SL
Wrawby Junction pass 06250625 pass0623 -2
Scunthorpe F.O.B. Junction pass 06410641 pass0639 -2
SCU Scunthorpe pass 1 min engineering allowance 2 06460646 pass0645 -1
CWE Crowle pass 4 min pathing allowance 2 0700½0700½ pass0658 -2
Thorne Junction pass 2 min engineering allowance SLLine 07140714 pass0710 -4 SL
HFS Hatfield & Stainforth pass 0719½0719½ pass0716 -3
Thorpe Marsh Junction pass 0725½0725½ pass0724 -1
Haywood Junction pass 07280728 pass0729 +1
Knottingley South Junction pass 07460746 pass0743 -3
Knottingley SIG Fe6423 not advertised vehicles attached and detached, crew changed 0749½0753½ 0750 -3
Knottingley East Junction pass 07550755 pass0751 -4
Sudforth Lane Signal Box pass 08010801 pass0756 -5
WBD Whitley Bridge pass 2 0803½0803½ pass0759 -3
HEL Hensall pass 2 0806½0806½ pass0801 -4
Drax Branch Junction pass 0808½0808½ pass0804 -4
Drax Ps Signal D17 pass 08150815 passno report
Drax Power Station not advertised 0817 0814 -3