7th September 2026
12:03 – Hope (Earles Sidings) Dbs → Belmont Down Yard Arrived -3 Early operated by Not specified (freight or charter)
Reported as far as Belmont Down Yard · 18 of 18 reporting points · 36 of 36 miles
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Hope (Earles Sidings) Dbs not advertised | 1203 | 1200 | -3 | |||
| Earles Sdgs S.B. pass | 12051205 | pass1202 | -3 | |||
| BAM Bamford pass | 2 | 12091209 | pass1207 | -2 | ||
| HSG Hathersage pass 1 min engineering, ½ min pathing allowance | 2 | 1210½1210½ | pass1209 | -1 | ||
| GRN Grindleford pass | 2 | 1213½1213½ | pass1211 | -2 | ||
| Dore West Junction pass | 1217½1217½ | pass1216 | -1 | |||
| Dore Station Junction pass | 12191219 | pass1217 | -2 | |||
| SHF Sheffield not advertised crew changed | 1 was TL | 1224½1240 | 1223 | -17 | ||
| Nunnery Main Line Junction pass | 12421242 | pass1225 | -17 | |||
| Wincobank Junction pass | 1245½1245½ | passno report | ||||
| Holmes Junction pass | 1247½1247½ | pass1233 | -14 | |||
| Masborough Junction pass | 1248½1248½ | pass1235 | -13 | |||
| Aldwarke Junction pass | 1251½1251½ | pass1238 | -13 | |||
| SWN Swinton (S.Yorks) pass 1 min pathing allowance | 1 | 1255½1255½ | pass1241 | -14 | ||
| MEX Mexborough pass 1 min engineering, 1 min pathing allowance | 2 | 1258½1258½ | pass1244 | -14 | ||
| Hexthorpe Junction pass UGLLine | 1306½1306½ | pass1250 | -16 | UGL | ||
| Bridge Junction pass | 1309½1309½ | passno report | ||||
| Belmont Down Yard not advertised | 1315 | 1312 | -3 | |||
Italic estimated timing, bold is actual.