This is the 2H70 0949 Tunbridge Wells to London Charing Cross on 31st August 2026. See today's trains from Tunbridge Wells around 0949 →
31st August 2026 Detailed View
09:49 – Tunbridge Wells → London Charing Cross Partially cancelled — Track circuit failure (including no fault found) operated by Southeastern
This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.
Reported as far as London Bridge · 7 of 9 stops made, 2 cancelled · 32 of 34 miles
Formation Class 465
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| TBW Tunbridge Wells | 1 | 0949 | 0953 | +4 | ||
| HIB High Brooms | 1 | 0952 | 0953 | 0956 | 0957 | +4 |
| TON Tonbridge | 2 | 0959 | 1000 | 1003 | 1004 | +4 |
| HLB Hildenborough | 1 | 1004 | 1004 | 1008 | 1009 | +5 |
| SEV Sevenoaks | 1 | 1010 | 1011 | 1017 | 1018 | +7 |
| ORP Orpington | 2 | 1019 | 1020 | 1028 | 1029 | +9 |
| LBG London Bridge | 3 was 9 | 1035 | 1037 | 1047 | 1048 | +11 |
| WAE London Waterloo East | D | 1041 | 1042 | Cancelled | ||
| CHX London Charing Cross | 6 | 1045 | Cancelled |
Italic estimated timing, bold is actual.