1H70 0930 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H70 0930 Hastings to London Charing Cross on 31st August 2026. See today's trains from Hastings around 0930 →

31st August 2026 Detailed View

09:30 – Hastings → London Charing Cross Partially cancelled — Track circuit failure (including no fault found) operated by Southeastern

This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.

Reported as far as London Bridge · 9 of 11 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 0930 0931 +1
SLQ St Leonards Warrior Sq 1 0933 0933 0934 0936 +3
BAT Battle 1 0943 0944 0947 0948 +4
WAD Wadhurst 1 1000 1000 1005 1005 +6
TBW Tunbridge Wells 1 1008 1009 1012 1013 +4
HIB High Brooms 1 1012 1013 1015 1016 +3
TON Tonbridge 2 1020 1021 1021 1025 +4
SEV Sevenoaks 1 1030 1031 1034 1035 +4
LBG London Bridge 3 was 9 1053 1055 1101 1103 +8
WAE London Waterloo East D 1059 1100 Cancelled
CHX London Charing Cross 5 1103 Cancelled

Italic estimated timing, bold is actual.