This is the 1H30 1145 London Charing Cross to Hastings on 31st August 2026. See today's trains from London Charing Cross around 1145 →
31st August 2026 Detailed View
11:45 – London Charing Cross → Hastings Partially cancelled — Broken/cracked/twisted/buckled/flawed rail operated by Southeastern
This service was cancelled between London Charing Cross and Hastings. This service has been cancelled because of a safety inspection of the track.
Reported as far as Tunbridge Wells · 6 of 18 stops made, 12 cancelled · 34 of 62 miles
Formation Class 375
London Charing Cross → Tonbridge
Passenger loading, as measured at Tunbridge Wells
Tonbridge → Tunbridge Wells
Passenger loading, as measured at Tunbridge Wells
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CHX London Charing Cross | 5 | 1145 | Cancelled | |||
| WAE London Waterloo East | C | 1148 | 1148 | Cancelled | ||
| LBG London Bridge | 1 was 6 | 1152 | 1154 | 1156 | 1158 | +4 |
| ORP Orpington | 3 | 1209 | 1209 | 1216 | 1217 | +8 |
| SEV Sevenoaks | 3 | 1218 | 1219 | 1225 | 1226 | +7 |
| TON Tonbridge | 3 | 1227 | 1231 | 1235 | 1249 | +18 |
| HIB High Brooms | 2 | 1236 | 1236 | 1254 | 1256 | +20 |
| TBW Tunbridge Wells | 2 | 1240 | 1241 | 1259 | +20 | |
| FRT Frant | 1245 | 1245 | Cancelled | |||
| WAD Wadhurst | 1250 | 1250 | Cancelled | |||
| SOG Stonegate | 1256 | 1256 | Cancelled | |||
| ETC Etchingham | 1301 | 1301 | Cancelled | |||
| RBR Robertsbridge | 1305 | 1305 | Cancelled | |||
| BAT Battle | 1312 | 1313 | Cancelled | |||
| CWU Crowhurst | 1317 | 1317 | Cancelled | |||
| WLD West St Leonards | 1322 | 1323 | Cancelled | |||
| SLQ St Leonards Warrior Sq | 2 | 1326 | 1326 | Cancelled | ||
| HGS Hastings | 3 | 1329 | Cancelled |
Italic estimated timing, bold is actual.