1H28 1115 London Charing Cross to Hastings

TrainTimesLive
Menu Close menu

This is the 1H28 1115 London Charing Cross to Hastings on 31st August 2026. See today's trains from London Charing Cross around 1115 →

31st August 2026 Detailed View

11:15 – London Charing Cross → Hastings Partially cancelled — Broken/cracked/twisted/buckled/flawed rail operated by Southeastern

This service was cancelled between London Charing Cross and Hastings. This service has been cancelled because of a safety inspection of the track.

Reported as far as Tunbridge Wells · 6 of 12 stops made, 6 cancelled · 34 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at Tunbridge Wells

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
CHX London Charing Cross 5 1115 Cancelled
WAE London Waterloo East C 1118 1118 Cancelled
LBG London Bridge 2 was 6 1122 1124 1121 1125 +1
ORP Orpington 3 1139 1139 1140 1141 +2
SEV Sevenoaks 3 1148 1149 1150 1151 +2
TON Tonbridge 3 1158 1159 1159 1200 +1
HIB High Brooms 2 1204 1205 1206 1207 +2
TBW Tunbridge Wells 2 1208 1210 1211 +3
WAD Wadhurst 1217 1217 Cancelled
BAT Battle 1233 1234 Cancelled
SLQ St Leonards Warrior Sq 2 1244 1244 Cancelled
HGS Hastings 4 1247 Cancelled

Italic estimated timing, bold is actual.