27th September 2026 Follow Detailed View
20:29 – Sevenoaks → London Charing Cross Planned operated by Southeastern
Not yet reported
Formation Class 465
How busy: 7% full. Darwin's own figure for the whole train, not per carriage, reported at Sevenoaks at 03:35.
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SEV Sevenoaks | 3 | 2029 | ||||
| ORP Orpington | 2 | 2037 | 2038 | |||
| LBG London Bridge | 8 | 2053 | 2055 | |||
| WAE London Waterloo East | D | 2059 | 2100 | |||
| CHX London Charing Cross | 6 | 2103 |
Italic estimated timing, bold is actual.