This is the 2R40 1606 Leamington Spa to Birmingham Moor Street on 21st September 2026. See today's trains from Leamington Spa around 1606 →
21st September 2026 Simple View
2R40 · 16:06 – Leamington Spa → Birmingham Moor Street Arrived +23 Late operated by Chiltern Railways
This service has been delayed by a fault with the signalling system.
WTTThe permanent working timetable Pathed as Class 165/0 on diesel at 75mph
Reported as far as Birmingham Moor Street · 7 of 7 stops made · 23 of 23 miles
Formation Class 165
Calling pattern
| Formed from 2L56 from Birmingham Snow Hill arrived 15:54 165011 | |||||||
| Public | Working | Actual | Route | ||||
|---|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | arrdep | Status | Line | Path |
| LMS Leamington Spa | 4 | 1606 | 1606 | 1605 | -1 | ||
| WRW Warwick | 1 | 16101611 | 16101611 | 16101611 | ·on time | ||
| HTN Hatton | 2 | 16161617 | 16161617 | 16181619 | +2 | ||
| LPW Lapworth | 2 | 16221623 | 16221623 | 16241626 | +3 | ||
| DDG Dorridge | 3 was 2 | 16271628 | 1626½1628 | 16311645 | +17 | ||
| Bentley Heath Crossing pass | pass1629 | pass1647 | +18 | ||||
| SOL Solihull | 2 | 16331634 | 1632½1634 | 16521654 | +20 | ||
| TYS Tyseley pass ½ min performance allowance FLLine | 2 | pass1638 | pass1701 | +23 | FL | ||
| XOH Small Heath South Junction pass 1 min engineering allowance SHLine | pass1639 | pass1703 | +24 | SH | |||
| BMO Birmingham Moor Street | 4 | 1644 | 1644 | 1707 | +23 | ||
| Forms 2L69 to Leamington Spa departs 17:21 165011 | |||||||
Italic estimated timing, bold is actual.