2H98 1850 Shepperton to London Waterloo

TrainTimesLive
Menu Close menu

25th September 2026 Simple View

2H98 · 18:50 – Shepperton → London Waterloo Arrived +5 Late operated by South Western Railway

This service has been delayed by a problem currently under investigation.

WTTThe permanent working timetable Pathed as electric at 75mph

Reported as far as London Waterloo · 12 of 12 stops made · 19 of 19 miles

Formation Class 701

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 2H51 from London Waterloo arrived 18:40 701043
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
SHP Shepperton ½ min pathing allowance 1 1850 1850 1851 +1
FLW Fulwell pass 1 pass1858½ pass1900 +2
STW Strawberry Hill pass 2 pass1900 pass1903 +3
Twickenham Junction pass FLLine pass1902½ passno report FL
TWI Twickenham 4 19041904 1903½1904½ 19071907 +3
SMG St Margarets 2 19061906 19061906½ 19081909 +3
RMD Richmond 2 19091910 19091910 19111912 +2
NSH North Sheen 1 19121912 1911½1912 19141915 +3
MTL Mortlake 1 19141914 19141914½ 19171918 +4
BNS Barnes SLLine 1 19171917 19171917½ 19211922 +5 SL
PUT Putney 1 19201920 1919½1920½ 19241925 +5
WNT Wandsworth Town 4 19231923 19231923½ 19271928 +5
CLJ Clapham Junction WSLLine 3 19261926 1925½1926½ 19301931 +5 WSL
West London Junction pass WLLine pass1928½ pass1933 +5 WL
QRB Queenstown Road (Battersea) pass 1 was 2 pass1929 pass1933 +4
Nine Elms Junction pass pass1930 pass1934 +4
VXH Vauxhall 1 min pathing allowance 1 19311932 19311932 19371938 +6
Waterloo West Crossings pass WR2Line pass1935 pass1940 +5 WR2
WAT London Waterloo 21 was 20 1939 1937 1942 +5

Italic estimated timing, bold is actual.