5S93 1925 London Waterloo to Woking

TrainTimesLive
Menu Close menu

21st September 2026

19:25 – London Waterloo → Woking Arrived -1 Early operated by South Western Railway

Empty coaching stock not available to passengers

Reported as far as Woking · 2 of 2 stops made · 34 of 34 miles

Formation Class 450

Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
WAT London Waterloo not advertised DWLine 15 1925 1922 -3 DW
Waterloo West Crossings pass 1½ min pathing allowance WSLLine 1926½1926½ pass1923 -3 WSL
Nine Elms Junction pass ½ min pathing allowance WLLine 1930½1930½ pass1929 -1 WL
QRB Queenstown Road (Battersea) pass WSLLine 3 19321932 pass1930 -2 WSL
CLJ Clapham Junction pass SLLine 6 19341934 pass1932 -2 SL
BNS Barnes pass 4 1938½1938½ pass1938 ·on time
KWB Kew Bridge pass 2 19421942 passno report
BFD Brentford pass 4½ min pathing allowance 1943½1943½ passno report
HOU Hounslow pass 2 19511951 passno report
Hounslow Junction pass 4 min pathing allowance 19521952 passno report
Feltham Junction pass 19571957 pass1947 -10
FEL Feltham pass 2 19591959 pass1950 -9
SNS Staines pass 2 2003½2003½ pass1957 -6
VIR Virginia Water pass 4 2010½2010½ pass2005 -4
CHY Chertsey pass 1 2014½2014½ pass2009 -5
Addlestone Junction pass 20172017 pass2013 -4
BFN Byfleet & New Haw pass 5 min pathing allowance SLLine 2 2019½2019½ pass2015 -4 SL
WOK Woking not advertised 5 2029 2028 -1

Italic estimated timing, bold is actual.