2R29 1223 Adwick to Sheffield

TrainTimesLive
Menu Close menu

This is the 2R29 1223 Adwick to Sheffield on 24th August 2026. See today's trains from Adwick around 1223 →

24th August 2026 Simple View

2R29 · 12:23 – Adwick → Sheffield Arrived +7 Late operated by Northern

WTTThe permanent working timetable Pathed as Class 150/153/155/156 on diesel at 75mph

Reported as far as Sheffield · 9 of 9 stops made · 23 of 23 miles

Formation Class 150

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 5R29 from Adwick arrived 12:22 empty stock 150146
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
AWK Adwick 1 1223 1223 1224 +1
BYK Bentley (S.Yorks) 1 12271228 12271228 12281229 +1
DON Doncaster 8 12321234 12321234½ 12321234 ·on time
Hexthorpe Junction pass pass1238 pass1237 -1
CNS Conisbrough 1 12421242 1241½1242 12401241 -1
MEX Mexborough 1 12461246 1245½1246½ 12451246 ·on time
SWN Swinton (S.Yorks) 3 12491249 12491249½ 12481249 ·on time
Aldwarke Junction pass pass1252½ pass1252 ·on time
RMC Rotherham Central 2½ min pathing allowance 1 12561257 12561257 12591259 +3
Holmes Junction pass ½ min pathing, 1 min performance allowance pass1302 pass1309 +7
MHS Meadowhall 1 13061307 13061307 13141314 +8
Wincobank Junction pass 1 min engineering allowance pass1307½ passno report
Nunnery Main Line Junction pass pass1312 pass1319 +7
SHF Sheffield 3 1314 1314 1321 +7
Forms 2R36 to Adwick departs 14:05 150146

Italic estimated timing, bold is actual.