2R69 2305 Sheffield to Doncaster

TrainTimesLive
Menu Close menu

This is the 2R69 2305 Sheffield to Doncaster on 27th August 2026. See today's trains from Sheffield around 2305 →

27th August 2026 Simple View

2R69 · 23:05 – Sheffield → Doncaster Arrived On time operated by Northern

WTTThe permanent working timetable Pathed as Class 150/153/155/156 on diesel at 75mph

Reported as far as Doncaster · 7 of 7 stops made · 19 of 19 miles

Formation Class 150

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 2L83 from Leeds arrived 22:54 150144
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
SHF Sheffield 3 2305 2305 2304 -1
Nunnery Main Line Junction pass pass2306½ pass2306 ·on time
Wincobank Junction pass pass2309½ passno report
MHS Meadowhall 2 23102311 23102311 23102311 ·on time
Holmes Junction pass pass2314 pass2314 ·on time
RMC Rotherham Central 2 23172319 2316½2319½ 23172318 -1
Aldwarke Junction pass 1 min pathing, 1 min performance allowance pass2323½ pass2323 ·on time
SWN Swinton (S.Yorks) 1 23292329 23292329½ 23262328 -1
MEX Mexborough 2 23322332 2331½2332½ 23312332 ·on time
CNS Conisbrough 2 23362336 23362336½ 23352336 ·on time
Hexthorpe Junction pass 1 min engineering, ½ min pathing allowance pass2340 pass2339 -1
DON Doncaster 8 2345 2344½ 2344 ·on time
Forms 5R69 to Doncaster departs 23:52 empty stock 150144

Italic estimated timing, bold is actual.