This is the 2W27 1852 Stalybridge to Southport on 26th September 2026. See today's trains from Stalybridge around 1852 →
26th September 2026 Detailed View
18:52 – Stalybridge → Southport Arrived +12 Late operated by Northern
This service has been delayed by a safety inspection of the track.
Reported as far as Southport · 22 of 22 stops made · 45 of 45 miles
Formation Class 156 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SYB Stalybridge | 5 | 1852 | 1851 | -1 | ||
| AHN Ashton-under-Lyne | 1 | 1855 | 1855 | 1854 | 1855 | ·on time |
| MCV Manchester Victoria Pathed as Class 150/153/155/156 on diesel at 75mph from here | 5 | 1906 | 1909 | 1909 | 1913 | +4 |
| SFD Salford Central | 2 | 1912 | 1912 | 1915 | 1916 | +4 |
| SLD Salford Crescent | 1 was 2 | 1915 | 1916 | 1919 | 1922 | +6 |
| KSL Kearsley | 2 was 1 | 1923 | 1923 | 1930 | 1931 | +8 |
| FNW Farnworth | 2 | 1925 | 1925 | 1932 | 1934 | +9 |
| MSS Moses Gate | 2 | 1928 | 1928 | 1935 | 1936 | +8 |
| BON Bolton | 5 | 1931 | 1932 | 1939 | 1941 | +9 |
| WHG Westhoughton | 2 | 1939 | 1940 | 1948 | +9 | |
| HIN Hindley | 2 | 1944 | 1944 | 1953 | 1954 | +10 |
| INC Ince | 1 | 1947 | 1947 | 1957 | 1958 | +11 |
| WGW Wigan Wallgate | 1 | 1950 | 1952 | 2000 | 2004 | +12 |
| GST Gathurst | 2 | 1957 | 1957 | 2008 | 2009 | +12 |
| APB Appley Bridge | 2 | 2001 | 2001 | 2012 | 2013 | +12 |
| PBL Parbold | 2 | 2006 | 2006 | 2016 | 2017 | +11 |
| HSC Hoscar | 2009 | 2009 | 2020 | 2021 | +12 | |
| BCB Burscough Bridge | 1 was 2 | 2012 | 2012 | 2023 | 2024 | +12 |
| NLN New Lane | 2015 | 2015 | 2027 | 2027 | +12 | |
| BES Bescar Lane | 2018 | 2018 | 2031 | 2032 | +14 | |
| MEC Meols Cop | 2 | 2023 | 2024 | 2036 | 2037 | +13 |
| SOP Southport | 4 | 2030 | 2042 | +12 |
Italic estimated timing, bold is actual.