19th September 2026
19:59 – Newcastle → Heaton T&R.S.M.D. Arrived -5 Early operated by Northern
Empty coaching stock not available to passengers
Reported as far as Heaton T&R.S.M.D. · 2 of 2 stops made · 2 of 2 miles
Formation Class 156 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| NCL Newcastle not advertised SLLine | 5 was 6 | 1959 | 1958 | -1 | SL | |
| Heaton Sth. Junction pass | 20052005 | pass2003 | -2 | |||
| XHT Heaton T&R.S.M.D. not advertised | 2009 | 2004 | -5 | |||
Italic estimated timing, bold is actual.