1H54 1526 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H54 1526 Hastings to London Charing Cross on 20th September 2026. See today's trains from Hastings around 1526 →

20th September 2026 Detailed View

15:26 – Hastings → London Charing Cross Partially cancelled — Broken/cracked/twisted/buckled/flawed rail operated by Southeastern

Planned diversion. Calling at Hildenborough, which this service does not normally serve.

This service was cancelled between London Bridge and London Charing Cross.

Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Waterloo East

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Waterloo East

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 1526 1526 ·on time
SLQ St Leonards Warrior Sq 1 1529 1529 1528 1529 ·on time
BAT Battle 1 1539 1540 1540 1542 +2
WAD Wadhurst 1 1557 1557 1610 1611 +14
TBW Tunbridge Wells 1 1604 1608 1619 1623 +15
HIB High Brooms 1 1611 1611 1626 1627 +16
TON Tonbridge 2 1617 1618 1633 1634 +16
HLB Hildenborough 1 1622 1622 1639 1639 +17
SEV Sevenoaks 1 1629 1629 1646 1647 +18
ORP Orpington 2 1637 1638 1656 1657 +19
LBG London Bridge 8 1653 1655 1713 +20
WAE London Waterloo East D 1659 1700 Cancelled
CHX London Charing Cross 6 1703 Cancelled

Italic estimated timing, bold is actual.