This is the 1H58 0620 Ore to London Charing Cross on 14th September 2026. See today's trains from Ore around 0620 →
14th September 2026 Detailed View
06:20 – Ore → London Charing Cross Arrived +3 Late operated by Southeastern
Reported as far as London Charing Cross · 14 of 14 stops made · 63 of 63 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| ORE Ore | 1 was 2 | 0620 | 0619 | -1 | ||
| HGS Hastings | 2 | 0623 | 0624 | 0622 | 0624 | ·on time |
| SLQ St Leonards Warrior Sq | 1 | 0627 | 0628 | 0626 | 0627 | -1 |
| BAT Battle | 1 | 0638 | 0638 | 0638 | 0639 | +1 |
| RBR Robertsbridge | 1 | 0646 | 0646 | 0646 | 0647 | +1 |
| ETC Etchingham | 1 | 0650 | 0650 | 0650 | 0650 | +1 |
| WAD Wadhurst | 0659 | 0700 | 0700 | 0701 | +1 | |
| TBW Tunbridge Wells | 1 | 0707 | 0709 | 0706 | 0709 | ·on time |
| HIB High Brooms | 0712 | 0713 | no report | no report | ||
| TON Tonbridge | 2 | 0719 | 0720 | 0718 | 0719 | -1 |
| SEV Sevenoaks | 1 | 0729 | 0730 | 0729 | 0730 | ·on time |
| LBG London Bridge | 9 was 8 | 0754 | 0756 | 0757 | 0758 | +2 |
| WAE London Waterloo East | B | 0800 | 0801 | 0802 | 0804 | +3 |
| CHX London Charing Cross | 2 was 1 | 0804 | 0807 | +3 |
Italic estimated timing, bold is actual.