1H60 1650 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H60 1650 Hastings to London Charing Cross on 29th August 2026. See today's trains from Hastings around 1650 →

29th August 2026 Detailed View

16:50 – Hastings → London Charing Cross Partially cancelled — Lost path - following another later running train operated by Southeastern

Planned diversion. Calling at Orpington, which this service does not normally serve.

This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.

Reported as far as London Bridge · 16 of 18 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 1650 1658 +8
SLQ St Leonards Warrior Sq 1 1653 1653 1700 1702 +9
WLD West St Leonards 1 1657 1657 1708 1708 +12
CWU Crowhurst 1 1702 1702 1713 1727 +25
BAT Battle 1 1706 1707 1730 1731 +24
RBR Robertsbridge 1 1714 1714 1739 1740 +26
ETC Etchingham 1 1718 1718 1743 1745 +26
SOG Stonegate 1 1723 1723 1750 +27
WAD Wadhurst 1 1729 1730 1756 1757 +27
FRT Frant 1 1734 1734 1801 1801 +28
TBW Tunbridge Wells 1 1739 1739 1805 1807 +28
HIB High Brooms 1 1743 1743 1810 1811 +28
TON Tonbridge 2 1749 1750 1817 1819 +29
SEV Sevenoaks 1 1758 1759 1828 1829 +30
ORP Orpington 2 1807 1808 1838 1839 +31
LBG London Bridge 8 was 9 1823 1825 1853 +30
WAE London Waterloo East D 1829 1830 Cancelled
CHX London Charing Cross 5 1833 Cancelled

Italic estimated timing, bold is actual.