1H62 1720 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H62 1720 Hastings to London Charing Cross on 23rd September 2026. See today's trains from Hastings around 1720 →

23rd September 2026 Detailed View

17:20 – Hastings → London Charing Cross Partially cancelled Arrived +4 Late operated by Southeastern

This service has been delayed by a speed restriction over defective track.

This service was cancelled between Tonbridge and London Bridge. This service has been cancelled because of a fault on a train.

Reported as far as London Charing Cross · 16 of 17 stops made, 1 cancelled · 62 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at Wadhurst

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 1720 1722 +2
SLQ St Leonards Warrior Sq 1 1723 1723 1725 1725 +2
WLD West St Leonards 1 1726 1727 1728 1729 +2
CWU Crowhurst 1 1732 1732 1734 1736 +4
BAT Battle 1 1736 1737 1739 1740 +3
RBR Robertsbridge 1 1744 1744 1746 1747 +3
ETC Etchingham 1 1748 1748 1750 1752 +3
SOG Stonegate 1 1753 1753 1756 1756 +3
WAD Wadhurst 1 1759 1800 1802 1803 +3
FRT Frant 1 1804 1804 1806 1807 +3
TBW Tunbridge Wells 1 1810 1811 1817 1818 +7
HIB High Brooms 1 1815 1815 1821 1822 +7
TON Tonbridge 2 1822 1823 1828 1830 +7
SEV Sevenoaks 1 1831 1832 1839 Cancelled
LBG London Bridge 8 1853 1855 1859 1900 +5
WAE London Waterloo East D 1859 1900 1904 1905 +5
CHX London Charing Cross 5 1903 1907 +4

Italic estimated timing, bold is actual.