This is the 1H62 1720 Hastings to London Charing Cross on 6th November 2026. See today's trains from Hastings around 1720 →
6th November 2026 Detailed View
17:20 – Hastings → London Charing Cross Arrived -2 Early operated by Southeastern
Reported as far as London Charing Cross · 17 of 17 stops made · 62 of 62 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 4 | 1720 | 1719 | -1 | ||
| SLQ St Leonards Warrior Sq | 1 | 1723 | 1723 | 1722 | 1723 | ·on time |
| WLD West St Leonards | 1 | 1726 | 1727 | 1726 | 1727 | ·on time |
| CWU Crowhurst | 1 | 1732 | 1732 | 1732 | 1732 | ·on time |
| BAT Battle | 1 | 1736 | 1737 | 1736 | 1736 | -1 |
| RBR Robertsbridge | 1 | 1744 | 1744 | 1743 | 1744 | ·on time |
| ETC Etchingham | 1 | 1748 | 1748 | 1747 | 1749 | ·on time |
| SOG Stonegate | 1 | 1753 | 1753 | 1753 | 1753 | ·on time |
| WAD Wadhurst | 1 | 1759 | 1800 | 1759 | 1800 | ·on time |
| FRT Frant | 1 | 1804 | 1804 | 1803 | 1806 | +2 |
| TBW Tunbridge Wells | 1 | 1810 | 1811 | 1810 | 1811 | ·on time |
| HIB High Brooms | 1 | 1815 | 1815 | 1814 | 1814 | ·on time |
| TON Tonbridge | 2 | 1822 | 1823 | 1821 | 1823 | ·on time |
| SEV Sevenoaks | 1 | 1831 | 1832 | 1831 | 1832 | ·on time |
| LBG London Bridge | 8 | 1853 | 1855 | 1853 | 1854 | -1 |
| WAE London Waterloo East | D | 1859 | 1900 | 1858 | 1858 | -1 |
| CHX London Charing Cross | 5 | 1903 | 1901 | -2 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.