This is the 1H64 1750 Hastings to London Charing Cross on 8th November 2026. See today's trains from Hastings around 1750 →
8th November 2026 Detailed View
17:50 – Hastings → London Charing Cross Arrived +1 Late operated by Southeastern
Reported as far as London Charing Cross · 18 of 18 stops made · 62 of 62 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 3 | 1750 | 1750 | ·on time | ||
| SLQ St Leonards Warrior Sq | 1 | 1753 | 1753 | 1753 | 1753 | ·on time |
| WLD West St Leonards | 1 | 1756 | 1757 | 1755 | 1757 | ·on time |
| CWU Crowhurst | 1 | 1802 | 1802 | 1802 | 1802 | ·on time |
| BAT Battle | 1 | 1806 | 1807 | 1806 | 1807 | ·on time |
| RBR Robertsbridge | 1 | 1814 | 1814 | 1813 | 1814 | ·on time |
| ETC Etchingham | 1 | 1818 | 1818 | 1817 | 1819 | ·on time |
| SOG Stonegate | 1 | 1823 | 1823 | 1823 | 1823 | ·on time |
| WAD Wadhurst | 1 | 1829 | 1830 | 1829 | 1830 | ·on time |
| FRT Frant | 1 | 1834 | 1834 | 1833 | 1834 | ·on time |
| TBW Tunbridge Wells | 2 was 1 | 1839 | 1839 | 1839 | 1840 | +1 |
| HIB High Brooms | 1 | 1843 | 1843 | 1844 | 1844 | +1 |
| TON Tonbridge | 2 | 1849 | 1850 | 1850 | 1851 | +1 |
| SEV Sevenoaks | 1 | 1858 | 1859 | 1900 | 1901 | +2 |
| ORP Orpington | 2 | 1907 | 1908 | 1909 | 1910 | +2 |
| LBG London Bridge | 8 | 1923 | 1925 | 1926 | 1927 | +2 |
| WAE London Waterloo East | D | 1929 | 1930 | 1931 | 1931 | +2 |
| CHX London Charing Cross | 6 | 1933 | 1934 | +1 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.