This is the 1H70 0931 Hastings to London Charing Cross on 6th November 2026. See today's trains from Hastings around 0931 →
6th November 2026 Detailed View
09:31 – Hastings → London Charing Cross Partially cancelled — Cutting or embankment earthslip, rock fall or subsidence operated by Southeastern
This service was cancelled between London Bridge and London Charing Cross.
Reported as far as London Bridge · 9 of 11 stops made, 2 cancelled · 60 of 62 miles
Formation Class 375
Passenger loading, as measured at London Bridge
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 4 | 0931 | 0931 | ·on time | ||
| SLQ St Leonards Warrior Sq | 1 | 0934 | 0934 | 0934 | 0935 | +1 |
| BAT Battle | 1 | 0944 | 0945 | 1000 | 1001 | +16 |
| WAD Wadhurst | 1 | 1001 | 1001 | 1017 | 1019 | +18 |
| TBW Tunbridge Wells | 1 | 1008 | 1010 | 1026 | 1026 | +16 |
| HIB High Brooms | 1 | 1013 | 1014 | 1029 | 1030 | +16 |
| TON Tonbridge | 1 | 1020 | 1021 | 1036 | 1038 | +17 |
| SEV Sevenoaks | 1 | 1030 | 1031 | 1048 | 1049 | +18 |
| LBG London Bridge | 8 was 9 | 1053 | 1055 | 1113 | +20 | |
| WAE London Waterloo East | D | 1059 | 1100 | Cancelled | ||
| CHX London Charing Cross | 5 | 1103 | Cancelled |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.