This is the 1H70 1931 Hastings to London Charing Cross on 26th August 2026. See today's trains from Hastings around 1931 →
26th August 2026 Detailed View
19:31 – Hastings → London Charing Cross Partially cancelled — Late arrival of booked inward stock operated by Southeastern
This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of trespassers on the railway earlier today.
Reported as far as London Bridge · 9 of 11 stops made, 2 cancelled · 60 of 62 miles
Formation Class 375
Passenger loading, as measured at London Bridge
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 4 | 1931 | 1948 | +17 | ||
| SLQ St Leonards Warrior Sq | 1 | 1934 | 1934 | 1950 | 1952 | +18 |
| BAT Battle | 1 | 1944 | 1945 | 2007 | 2008 | +23 |
| WAD Wadhurst | 1 | 2001 | 2001 | 2024 | 2025 | +24 |
| TBW Tunbridge Wells | 1 | 2009 | 2010 | 2032 | 2033 | +23 |
| HIB High Brooms | 1 | 2013 | 2014 | 2036 | 2037 | +23 |
| TON Tonbridge | 2 | 2020 | 2021 | 2042 | 2044 | +23 |
| SEV Sevenoaks | 1 | 2030 | 2031 | 2053 | 2054 | +23 |
| LBG London Bridge | 8 | 2053 | 2055 | 2119 | +26 | |
| WAE London Waterloo East | D | 2059 | 2100 | Cancelled | ||
| CHX London Charing Cross | 5 | 2103 | Cancelled |
Italic estimated timing, bold is actual.