1H70 1930 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H70 1930 Hastings to London Charing Cross on 19th September 2026. See today's trains from Hastings around 1930 →

19th September 2026 Detailed View

19:30 – Hastings → London Charing Cross Partially cancelled — Broken/cracked/twisted/buckled/flawed rail operated by Southeastern

Planned diversion. Calling at Hildenborough and Orpington, which this service does not normally serve.

This service was cancelled between London Bridge and London Charing Cross.

Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 was 3 1930 1933 +3
SLQ St Leonards Warrior Sq 1 1933 1933 1936 1937 +4
BAT Battle 1 1943 1944 1947 1948 +4
WAD Wadhurst 1 2000 2000 2005 2006 +6
TBW Tunbridge Wells 1 2007 2008 2013 2014 +6
HIB High Brooms 1 2011 2011 2017 2017 +6
TON Tonbridge 2 2017 2018 2023 2024 +6
HLB Hildenborough 1 2022 2022 2028 2028 +6
SEV Sevenoaks 1 2029 2029 2040 2041 +12
ORP Orpington 2 2037 2038 2050 2051 +13
LBG London Bridge 8 was 9 2053 2055 2108 +15
WAE London Waterloo East D 2059 2100 Cancelled
CHX London Charing Cross 5 2103 Cancelled

Italic estimated timing, bold is actual.