This is the 1H70 1930 Hastings to London Charing Cross on 19th September 2026. See today's trains from Hastings around 1930 →
19th September 2026 Detailed View
19:30 – Hastings → London Charing Cross Partially cancelled — Broken/cracked/twisted/buckled/flawed rail operated by Southeastern
Planned diversion. Calling at Hildenborough and Orpington, which this service does not normally serve.
This service was cancelled between London Bridge and London Charing Cross.
Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles
Formation Class 375
Passenger loading, as measured at London Bridge
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 4 was 3 | 1930 | 1933 | +3 | ||
| SLQ St Leonards Warrior Sq | 1 | 1933 | 1933 | 1936 | 1937 | +4 |
| BAT Battle | 1 | 1943 | 1944 | 1947 | 1948 | +4 |
| WAD Wadhurst | 1 | 2000 | 2000 | 2005 | 2006 | +6 |
| TBW Tunbridge Wells | 1 | 2007 | 2008 | 2013 | 2014 | +6 |
| HIB High Brooms | 1 | 2011 | 2011 | 2017 | 2017 | +6 |
| TON Tonbridge | 2 | 2017 | 2018 | 2023 | 2024 | +6 |
| HLB Hildenborough | 1 | 2022 | 2022 | 2028 | 2028 | +6 |
| SEV Sevenoaks | 1 | 2029 | 2029 | 2040 | 2041 | +12 |
| ORP Orpington | 2 | 2037 | 2038 | 2050 | 2051 | +13 |
| LBG London Bridge | 8 was 9 | 2053 | 2055 | 2108 | +15 | |
| WAE London Waterloo East | D | 2059 | 2100 | Cancelled | ||
| CHX London Charing Cross | 5 | 2103 | Cancelled |
Italic estimated timing, bold is actual.