This is the 1H72 1950 Hastings to London Charing Cross on 19th November 2026. See today's trains from Hastings around 1950 →
19th November 2026 Detailed View
19:50 – Hastings → London Charing Cross Partially cancelled — Track circuit failure (including no fault found) operated by Southeastern
This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.
Reported as far as London Bridge · 15 of 17 stops made, 2 cancelled · 60 of 62 miles
Formation Class 375
Passenger loading, as measured at London Bridge
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 3 | 1950 | 1950 | ·on time | ||
| SLQ St Leonards Warrior Sq | 1 | 1953 | 1953 | 1953 | 1953 | +1 |
| WLD West St Leonards | 1 | 1958 | 1958 | 1956 | 1958 | ·on time |
| CWU Crowhurst | 1 | 2004 | 2004 | 2003 | 2004 | ·on time |
| BAT Battle | 1 | 2008 | 2008 | 2007 | 2008 | ·on time |
| RBR Robertsbridge | 1 | 2016 | 2016 | 2015 | 2015 | ·on time |
| ETC Etchingham | 1 | 2019 | 2020 | 2019 | 2020 | ·on time |
| SOG Stonegate | 1 | 2025 | 2025 | 2025 | ·on time | |
| WAD Wadhurst | 1 | 2031 | 2031 | 2030 | 2031 | ·on time |
| FRT Frant | 1 | 2035 | 2035 | 2035 | 2035 | ·on time |
| TBW Tunbridge Wells | 1 | 2040 | 2041 | 2039 | 2046 | +5 |
| HIB High Brooms | 1 | 2044 | 2044 | 2049 | 2050 | +6 |
| TON Tonbridge | 2 | 2050 | 2051 | 2055 | 2057 | +6 |
| SEV Sevenoaks | 1 | 2100 | 2101 | 2105 | 2106 | +5 |
| LBG London Bridge | 3 was 8 | 2123 | 2125 | 2135 | 2137 | +12 |
| WAE London Waterloo East | D | 2129 | 2130 | Cancelled | ||
| CHX London Charing Cross | 5 | 2133 | Cancelled |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.