This is the 1H74 1030 Hastings to London Charing Cross on 4th November 2026. See today's trains from Hastings around 1030 →
4th November 2026 Detailed View
10:30 – Hastings → London Charing Cross Partially cancelled — Track circuit failure (including no fault found) operated by Southeastern
This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.
Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 4 | 1030 | 1030 | ·on time | ||
| SLQ St Leonards Warrior Sq | 1 | 1033 | 1033 | 1033 | 1034 | +1 |
| BAT Battle | 1 | 1043 | 1044 | 1043 | 1044 | ·on time |
| WAD Wadhurst | 1 | 1100 | 1100 | 1100 | 1100 | +1 |
| TBW Tunbridge Wells | 1 | 1107 | 1108 | 1108 | 1109 | +1 |
| HIB High Brooms | 1 | 1111 | 1111 | 1112 | 1112 | +1 |
| TON Tonbridge | 2 | 1117 | 1118 | 1118 | 1119 | +1 |
| HLB Hildenborough | 1 | 1122 | 1122 | 1123 | 1124 | +2 |
| SEV Sevenoaks | 1 | 1129 | 1129 | 1132 | 1132 | +4 |
| ORP Orpington | 2 | 1137 | 1138 | 1145 | 1146 | +8 |
| LBG London Bridge | 2 was 8 | 1153 | 1155 | 1216 | +23 | |
| WAE London Waterloo East | D | 1159 | 1200 | Cancelled | ||
| CHX London Charing Cross | 5 | 1203 | Cancelled |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.