1H74 2030 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H74 2030 Hastings to London Charing Cross on 29th August 2026. See today's trains from Hastings around 2030 →

29th August 2026 Detailed View

20:30 – Hastings → London Charing Cross Partially cancelled Never activated +21 Late operated by Southeastern

This service has been delayed by a fault with the signalling system earlier today.

This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.

Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Waterloo East

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 2030 2032 +2
SLQ St Leonards Warrior Sq 1 2033 2033 2034 2035 +2
BAT Battle 1 2043 2044 2058 2059 +15
WAD Wadhurst 1 2100 2100 2117 2118 +18
TBW Tunbridge Wells 1 2107 2108 2124 2126 +18
HIB High Brooms 1 2111 2111 2128 2129 +18
TON Tonbridge 2 2117 2118 2135 2137 +19
HLB Hildenborough 1 2122 2122 2141 2141 +19
SEV Sevenoaks 1 2129 2129 2148 2149 +20
ORP Orpington 2 2137 2138 2157 2158 +20
LBG London Bridge 8 was 9 2153 2155 2214 +21
WAE London Waterloo East D 2159 2200 Cancelled
CHX London Charing Cross 5 2203 Cancelled

Italic estimated timing, bold is actual.