1H78 1130 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H78 1130 Hastings to London Charing Cross on 21st September 2026. See today's trains from Hastings around 1130 →

21st September 2026 Detailed View

11:30 – Hastings → London Charing Cross Partially cancelled — Late arrival of booked inward stock operated by Southeastern

This service was cancelled between London Bridge and London Charing Cross.

Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 1130 1131 +1
SLQ St Leonards Warrior Sq 1 1133 1133 1134 1135 +2
BAT Battle 1 1143 1144 1150 1151 +7
WAD Wadhurst 1 1200 1200 1215 1216 +16
TBW Tunbridge Wells 1 1207 1208 1225 1227 +19
HIB High Brooms 1 1211 1211 1230 1230 +19
TON Tonbridge 2 1217 1218 1237 1238 +20
HLB Hildenborough 1 1222 1222 1243 1243 +21
SEV Sevenoaks 1 1229 1229 1250 1251 +22
ORP Orpington 2 1237 1238 1300 1301 +23
LBG London Bridge 8 1253 1255 1317 +24
WAE London Waterloo East D 1259 1300 Cancelled
CHX London Charing Cross 5 1303 Cancelled

Italic estimated timing, bold is actual.