This is the 1H78 1130 Hastings to London Charing Cross on 4th November 2026. See today's trains from Hastings around 1130 →
4th November 2026 Detailed View
11:30 – Hastings → London Charing Cross Partially cancelled — Track circuit failure (including no fault found) operated by Southeastern
This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.
Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles
Formation Class 375
Passenger loading, as measured at Orpington
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGS Hastings | 4 | 1130 | 1134 | +4 | ||
| SLQ St Leonards Warrior Sq | 1 | 1133 | 1133 | 1137 | 1138 | +5 |
| BAT Battle | 1143 | 1144 | no report | no report | +2 | |
| WAD Wadhurst | 1 | 1200 | 1200 | 1211 | 1213 | +13 |
| TBW Tunbridge Wells | 1 | 1207 | 1208 | 1221 | 1222 | +14 |
| HIB High Brooms | 1 | 1211 | 1211 | 1225 | 1226 | +15 |
| TON Tonbridge | 1 was 2 | 1217 | 1218 | 1231 | 1233 | +15 |
| HLB Hildenborough | 1 | 1222 | 1222 | 1237 | 1238 | +16 |
| SEV Sevenoaks | 1 | 1229 | 1229 | 1244 | 1245 | +16 |
| ORP Orpington | 2 | 1237 | 1238 | 1253 | 1254 | +16 |
| LBG London Bridge | 2 was 8 | 1253 | 1255 | 1310 | +17 | |
| WAE London Waterloo East | D | 1259 | 1300 | Cancelled | ||
| CHX London Charing Cross | 5 | 1303 | Cancelled |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.