1H82 1230 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H82 1230 Hastings to London Charing Cross on 28th August 2026. See today's trains from Hastings around 1230 →

28th August 2026 Detailed View

12:30 – Hastings → London Charing Cross Partially cancelled — Late arrival of booked inward stock operated by Southeastern

This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a speed restriction over defective track.

Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 1230 1238 +8
SLQ St Leonards Warrior Sq 1 1233 1233 1241 1241 +8
BAT Battle 1 1243 1244 1253 1254 +10
WAD Wadhurst 1 1300 1300 1311 1312 +12
TBW Tunbridge Wells 1 1307 1308 1319 1320 +12
HIB High Brooms 1 1311 1311 1323 1324 +13
TON Tonbridge 2 1317 1318 1330 1331 +13
HLB Hildenborough 1 1322 1322 1335 1335 +13
SEV Sevenoaks 1 1329 1329 1342 1343 +14
ORP Orpington 2 1337 1338 1352 1353 +15
LBG London Bridge 8 1353 1355 1409 +16
WAE London Waterloo East D 1359 1400 Cancelled
CHX London Charing Cross 5 1403 Cancelled

Italic estimated timing, bold is actual.