1H82 1230 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H82 1230 Hastings to London Charing Cross on 14th September 2026. See today's trains from Hastings around 1230 →

14th September 2026 Detailed View

12:30 – Hastings → London Charing Cross Partially cancelled — Late arrival of booked inward stock operated by Southeastern

This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault with the signalling system.

Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 1230 1230 ·on time
SLQ St Leonards Warrior Sq 1 1233 1233 1232 1234 +1
BAT Battle 1 1243 1244 1245 1246 +2
WAD Wadhurst 1300 1300 1301 1302 +2
TBW Tunbridge Wells 1 1307 1308 1309 1310 +2
HIB High Brooms 1311 1311 no report no report
TON Tonbridge 2 1317 1318 1325 1327 +9
HLB Hildenborough 1 1322 1322 1331 1332 +10
SEV Sevenoaks 1 1329 1329 1345 1346 +17
ORP Orpington 2 1337 1338 1355 1356 +18
LBG London Bridge 8 1353 1355 1418 +25
WAE London Waterloo East D 1359 1400 Cancelled
CHX London Charing Cross 5 1403 Cancelled

Italic estimated timing, bold is actual.