1H82 1230 Hastings to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1H82 1230 Hastings to London Charing Cross on 5th September 2026. See today's trains from Hastings around 1230 →

5th September 2026 Detailed View

12:30 – Hastings → London Charing Cross Partially cancelled — Late arrival of booked inward stock operated by Southeastern

This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault on this train.

Reported as far as London Bridge · 11 of 13 stops made, 2 cancelled · 60 of 62 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGS Hastings 4 1230 1235 +5
SLQ St Leonards Warrior Sq 1 1233 1233 1238 1239 +6
BAT Battle 1 1243 1244 1250 1250 +7
WAD Wadhurst 1 1300 1300 1308 1309 +9
TBW Tunbridge Wells 1 1307 1308 1316 1317 +9
HIB High Brooms 1 1311 1311 1320 1321 +10
TON Tonbridge 2 1317 1318 1327 1328 +10
HLB Hildenborough 1 1322 1322 1334 1335 +13
SEV Sevenoaks 1 1329 1329 1341 1342 +13
ORP Orpington 2 1337 1338 1351 1352 +14
LBG London Bridge 8 was 9 1353 1355 1406 +13
WAE London Waterloo East D 1359 1400 Cancelled
CHX London Charing Cross 5 1403 Cancelled

Italic estimated timing, bold is actual.