This is the 1H88 1450 Tonbridge to London Charing Cross on 1st November 2026. See today's trains from Tonbridge around 1450 →
1st November 2026 Simple View
1H88 · 14:50 – Tonbridge → London Charing Cross Arrived On time operated by Southeastern
VAROverlay: a short-term plan replacing the timetable for this date Pathed as electric at 100mph
Reported as far as London Charing Cross · 6 of 6 stops made · 29 of 29 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Formed from 1H38 from London Charing Cross arrived 14:30 375611, 375704 | |||||||
| Public | Working | Actual | Route | ||||
|---|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | arrdep | Status | Line | Path |
| TON Tonbridge | 4 | 1450 | 1450 | 1450 | ·on time | ||
| SEV Sevenoaks | 1 | 14581459 | 14581459½ | 14591500 | +1 | ||
| ORP Orpington FLLine | 2 | 15071508 | 15071508 | 15081509 | +1 | FL | |
| XPE Petts Wood Junction pass | pass1510 | pass1511 | +1 | ||||
| CIT Chislehurst pass | 1 | pass1511 | pass1513 | +2 | |||
| GRP Grove Park pass FLPath | 2 | pass1513 | pass1515 | +2 | FL | ||
| HGR Hither Green pass | 1 | pass1514½ | pass1517 | +3 | |||
| XPY Parks Bridge Junction pass ½ min pathing allowance UKFLineFLPath | pass1516 | pass1518 | +2 | UKF | FL | ||
| Tanners Hill Junction (Nx) pass | pass1517½ | pass1519 | +2 | ||||
| NWX New Cross pass | pass1518½ | pass1520 | +2 | ||||
| Blue Anchor (Kent) pass 8Line | pass1520½ | pass1522 | +2 | 8 | |||
| LBG London Bridge UCXLine | 8 | 15231525 | 15231525 | 15251526 | +1 | UCX | |
| Ewer Street Junction pass FLLine | pass1527 | pass1528 | +1 | FL | |||
| WAE London Waterloo East | D | 15291530 | 15291530 | 15291530 | ·on time | ||
| CHX London Charing Cross | 6 | 1533 | 1533 | 1533 | ·on time | ||
| Forms 1H46 to Tonbridge departs 15:45 375611, 375704 | |||||||
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.