This is the 1U04 1929 London Charing Cross to Maidstone East on 22nd September 2026. See today's trains from London Charing Cross around 1929 →
22nd September 2026 Detailed View
19:29 – London Charing Cross → Maidstone East Arrived -4 Early operated by Southeastern
This service has been delayed by a speed restriction over defective track.
Reported as far as Maidstone East · 8 of 8 stops made · 38 of 38 miles
Formation Class 377
Passenger loading, as measured at West Malling
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CHX London Charing Cross | 5 | 1929 | 1932 | +3 | ||
| WAE London Waterloo East | C | 1932 | 1932 | 1935 | 1936 | +4 |
| LBG London Bridge | 6 | 1936 | 1938 | 1941 | 1942 | +4 |
| SAY Swanley | 2 | 1959 | 2000 | 2003 | 2004 | +4 |
| OTF Otford | 2 | 2008 | 2008 | 2012 | 2013 | +5 |
| BRG Borough Green & Wrotham | 2 | 2019 | 2019 | 2020 | 2021 | +2 |
| WMA West Malling | 2 | 2026 | 2027 | 2026 | 2027 | ·on time |
| MDE Maidstone East | 2 | 2038 | 2034 | -4 |
Italic estimated timing, bold is actual.