This is the 1U08 2029 London Charing Cross to Maidstone East on 27th August 2026. See today's trains from London Charing Cross around 2029 →
27th August 2026 Detailed View
20:29 – London Charing Cross → Maidstone East Arrived -7 Early operated by Southeastern
Reported as far as Maidstone East · 8 of 8 stops made · 38 of 38 miles
Formation Class 377
Passenger loading, as measured at Otford
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CHX London Charing Cross | 5 | 2029 | 2029 | ·on time | ||
| WAE London Waterloo East | C | 2032 | 2032 | 2031 | 2032 | ·on time |
| LBG London Bridge | 6 | 2036 | 2038 | 2035 | 2038 | ·on time |
| SAY Swanley | 2 | 2100 | 2101 | 2056 | 2100 | -1 |
| OTF Otford | 2 | 2109 | 2110 | 2108 | 2109 | -1 |
| BRG Borough Green & Wrotham | 2 | 2119 | 2119 | 2117 | 2118 | -1 |
| WMA West Malling | 2 | 2126 | 2126 | 2124 | 2125 | -1 |
| MDE Maidstone East | 3 | 2140 | 2133 | -7 |
Italic estimated timing, bold is actual.