This is the 1U12 0929 London Charing Cross to Maidstone East on 28th October 2026. See today's trains from London Charing Cross around 0929 →
28th October 2026 Detailed View
09:29 – London Charing Cross → Maidstone East Arrived +2 Late operated by Southeastern
This service has been delayed by a fault with the signalling system.
Reported as far as Maidstone East · 8 of 8 stops made · 38 of 38 miles
Formation Class 377
Passenger loading, as measured at West Malling
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CHX London Charing Cross | 4 | 0929 | 0932 | +3 | ||
| WAE London Waterloo East | C | 0932 | 0932 | 0935 | 0936 | +4 |
| LBG London Bridge | 7 | 0936 | 0938 | 0940 | 0941 | +3 |
| SAY Swanley | 2 | 0959 | 0959 | 1000 | 1001 | +2 |
| OTF Otford | 2 | 1007 | 1008 | 1008 | 1009 | +1 |
| BRG Borough Green & Wrotham | 2 | 1015 | 1016 | 1017 | 1019 | +3 |
| WMA West Malling | 2 | 1022 | 1023 | 1025 | 1026 | +3 |
| MDE Maidstone East | 3 | 1033 | 1035 | +2 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.