1U36 1529 London Charing Cross to Maidstone East

TrainTimesLive
Menu Close menu

This is the 1U36 1529 London Charing Cross to Maidstone East on 26th August 2026. See today's trains from London Charing Cross around 1529 →

26th August 2026 Detailed View

15:29 – London Charing Cross → Maidstone East Partially cancelled — Trespass including non-intentional operated by Southeastern

This service was cancelled between London Bridge and Maidstone East. This service has been cancelled because of a safety inspection of the track.

Reported as far as Chislehurst · 3 of 8 stops made, 5 cancelled · 11 of 38 miles

Formation Class 377

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
CHX London Charing Cross 5 1529 1529 ·on time
WAE London Waterloo East C 1532 1532 1532 1533 +1
LBG London Bridge 7 1536 1538 1536 1538 ·on time
SAY Swanley 2 1559 1559 Cancelled
OTF Otford 1607 1608 Cancelled
BRG Borough Green & Wrotham 1616 1617 Cancelled
WMA West Malling 1624 1625 Cancelled
MDE Maidstone East 3 1634 Cancelled

Italic estimated timing, bold is actual.