This is the 1U36 1529 London Charing Cross to Maidstone East on 26th August 2026. See today's trains from London Charing Cross around 1529 →
26th August 2026 Detailed View
15:29 – London Charing Cross → Maidstone East Partially cancelled — Trespass including non-intentional operated by Southeastern
This service was cancelled between London Bridge and Maidstone East. This service has been cancelled because of a safety inspection of the track.
Reported as far as Chislehurst · 3 of 8 stops made, 5 cancelled · 11 of 38 miles
Formation Class 377
Passenger loading, as measured at London Bridge
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CHX London Charing Cross | 5 | 1529 | 1529 | ·on time | ||
| WAE London Waterloo East | C | 1532 | 1532 | 1532 | 1533 | +1 |
| LBG London Bridge | 7 | 1536 | 1538 | 1536 | 1538 | ·on time |
| SAY Swanley | 2 | 1559 | 1559 | Cancelled | ||
| OTF Otford | 1607 | 1608 | Cancelled | |||
| BRG Borough Green & Wrotham | 1616 | 1617 | Cancelled | |||
| WMA West Malling | 1624 | 1625 | Cancelled | |||
| MDE Maidstone East | 3 | 1634 | Cancelled |
Italic estimated timing, bold is actual.