1U54 1614 Maidstone East to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1U54 1614 Maidstone East to London Charing Cross on 8th September 2026. See today's trains from Maidstone East around 1614 →

8th September 2026 Detailed View

16:14 – Maidstone East → London Charing Cross Partially cancelled — Electric loco failure, defect, attention operated by Southeastern

This service was cancelled between Swanley and London Charing Cross. This service has been cancelled because of a broken down train.

Reported as far as St Mary Cray Junction · 5 of 8 stops made, 3 cancelled · 27 of 38 miles

Formation Class 377

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at Swanley

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
MDE Maidstone East 1 1614 1614 ·on time
WMA West Malling 1 1622 1622 1622 1621 -1
BRG Borough Green & Wrotham 1 1629 1629 1627 1629 ·on time
OTF Otford 1 1637 1638 1636 1638 ·on time
SAY Swanley 1 1647 1648 1645 1648 ·on time
LBG London Bridge 8 1707 1709 Cancelled
WAE London Waterloo East D 1714 1715 Cancelled
CHX London Charing Cross 5 1718 Cancelled

Italic estimated timing, bold is actual.