This is the 1U58 1714 Maidstone East to London Charing Cross on 27th August 2026. See today's trains from Maidstone East around 1714 →
27th August 2026 Detailed View
17:14 – Maidstone East → London Charing Cross Arrived -1 Early operated by Southeastern
Reported as far as London Charing Cross · 8 of 8 stops made · 38 of 38 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| MDE Maidstone East | 3 | 1714 | 1714 | ·on time | ||
| WMA West Malling | 1 | 1722 | 1722 | 1722 | 1722 | ·on time |
| BRG Borough Green & Wrotham | 1 | 1729 | 1729 | 1728 | 1729 | ·on time |
| OTF Otford | 1 | 1737 | 1738 | 1737 | 1737 | -1 |
| SAY Swanley | 1 | 1747 | 1748 | 1745 | 1748 | ·on time |
| LBG London Bridge | 9 was 8 | 1807 | 1809 | 1808 | 1809 | ·on time |
| WAE London Waterloo East | D | 1814 | 1815 | 1813 | 1814 | -1 |
| CHX London Charing Cross | 5 | 1818 | 1817 | -1 |
Italic estimated timing, bold is actual.