1U66 1914 Maidstone East to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1U66 1914 Maidstone East to London Charing Cross on 8th September 2026. See today's trains from Maidstone East around 1914 →

8th September 2026 Detailed View

19:14 – Maidstone East → London Charing Cross Partially cancelled — Electric loco failure, defect, attention operated by Southeastern

This service was cancelled between London Bridge and London Charing Cross. This service has been cancelled because of a fault on a train earlier.

Reported as far as London Bridge · 6 of 8 stops made, 2 cancelled · 37 of 38 miles

Formation Class 377

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
MDE Maidstone East 3 1914 1913 -1
WMA West Malling 1 1922 1922 1921 1921 -1
BRG Borough Green & Wrotham 1 1929 1929 1927 1928 -1
OTF Otford 1 1937 1938 1936 1937 -1
SAY Swanley 1 1947 1948 1945 1947 -1
LBG London Bridge 3 was 8 2007 2009 2015 2016 +7
WAE London Waterloo East D 2014 2015 Cancelled
CHX London Charing Cross 5 2018 Cancelled

Italic estimated timing, bold is actual.